77.4 F
Basseterre

Roads and Drains Division Activities for Monday, June 30, 2025

Date:

Basseterre, St. Kitts (MoPIEUDT NEWS) – Today will be another busy day for the team of the Roads and Drains Division of the Public Works Department on St. Kitts. Look out for them at the following locations:

  • Trinity – backfilling the retaining wall that was damaged during recent heavy rain.
  • Half Moon – preparing to cast a wing wall that was damaged by heavy rain.
  • The Southeast Peninsula – trimming overgrown hedges that extend to the road.

The Public Works Department urges drivers and pedestrians to exercise caution when travelling through these areas.

For more information from the Public Works Department, visit mopieudt.gov.kn and follow the department’s Facebook page.

Related articles

PWD’s Field Locations for February 26, 2026

Basseterre, St. Kitts (Public Infrastructure News) – On Thursday, February 26, 2026, the Roads and Drains Division of the Public Works...

PWD’s Field Locations for February 24 – 25, 2026

Basseterre, St. Kitts (Public Infrastructure News) – On February 24 and 25, 2026, the Roads and Drains Division of the...

PWD’s Field Locations for February 20, 2026

Basseterre, St. Kitts (Public Infrastructure News) – On Friday, February 20, 2026, the Roads and Drains Division of the Public Works...

PWD’s Field Locations for February 17, 2026

Basseterre, St. Kitts (Public Infrastructure News) – On Tuesday, February 17, 2026, the Roads and Drains Division of the Public Works...
Call Now Button