PWD’s Field Locations for February 24 – 25, 2026

Date:

Basseterre, St. Kitts (Public Infrastructure News) – On February 24 and 25, 2026, the Roads and Drains Division of the Public Works Department (PWD) were engaged in the following activities:

LocationActivityStatus
CampsConstruction of retaining wall and road repairsOngoing
Half MoonRoadworkOngoing
ConareeDrain repairsOngoing

The PWD advises motorists and pedestrians to exercise caution when traveling in these areas and adhere to all road signage.

To report road issues, visit our Customer Support Portal, or call PWD’s Roads and Drains Division at (869) 467-1132.

Visit mopieudt.gov.kn, and follow PWD on Facebook and WhatsApp for updates from the department.

Water security starts with you. Every drop saved helps protect our nation's water supply. Join the campaign and discover simple ways to conserve water, reduce waste, and help build a more resilient St. Kitts—because every action matters, and every drop counts.
Water Conservation Flyer

Current Campaigns

Street Scout

Related articles

PWD Continues Road and Drainage Works in Saint Thomas and Saint Peter

Basseterre, Saint Kitts (Public Infrastructure News) – On Tuesday, September 22, 2026, the Roads and Drains Division of the Public Works...

Take a Look at PWD’s Fieldwork for September 21, 2026

Basseterre, Saint Kitts (Public Infrastructure News) – On Monday, September 21, 2026, the Roads and Drains Division of the Public Works...

PWD Field Teams Carry Out Road and Drainage Improvements in St. Peters and Half Way Tree

Basseterre, Saint Kitts (Public Infrastructure News) – On Tuesday, September 15, 2026, the Roads and Drains Division (RDD) of...

PWD’s Fieldwork and In-House Operations Continue

Basseterre, Saint Kitts (Public Infrastructure News) – On Monday, September 14, 2026, the Roads and Drains Division (RDD) of...