73.7 F
Basseterre

PWD Road Tracker – March 6, 2026

Date:

Basseterre, St. Kitts (Public Infrastructure News) – On Thursday, March 5, 2026, the Roads and Drains Division of the Public Works Department (PWD) performed the following activities:

LocationActivity
Cabbage Tree and CayonWorking on speed bumps
SuncrestCasting concrete for the drain rehabilitation project
CampsLaying base stones as part of the hillside stabilization and road repair project

Please visit our Customer Support Portal or call PWD’s Roads and Drains Division at (869) 467-1132 to request assistance with road repairs.

Get updates from the Public Works Department at mopieudt.gov.knthe Public Works Department’s Facebook page, and the Ministry’s Social Media pages.

Related articles

PWD Road Tracker – March 4 – 5, 2026

Basseterre, St. Kitts (Public Infrastructure News) – The Roads and Drains Division (R&D) of the Public Works Department (PWD)...

PWD Road Tracker – March 2, 2026

Basseterre, St. Kitts (Public Infrastructure News) – On Monday, March 2, 2026, the Roads and Drains Division of the Public Works...

PWD’s Field Locations for February 26, 2026

Basseterre, St. Kitts (Public Infrastructure News) – On Thursday, February 26, 2026, the Roads and Drains Division of the Public Works...

PWD’s Field Locations for February 24 – 25, 2026

Basseterre, St. Kitts (Public Infrastructure News) – On February 24 and 25, 2026, the Roads and Drains Division of the...
Call Now Button