PWD Improves Roads and Drains Across Multiple Communities

Date:

Basseterre, Saint Kitts (Public Infrastructure News) – On Wednesday, September 30, 2026, residents in Bird Rock, Douglas Estate, and Half Way Tree will benefit from new and continued maintenance activities of the Roads and Drains Division in the Public Works Department (PWD) as the division continues to address infrastructural issues around the island.

For a detailed summary of the team’s activities, please see Table 1.

ActivityLocationStatus
Drain RepairsHalf Way TreeOngoing
Roadwork Douglas Estate, Saint PetersOngoing
Road PatchingBird RockInitiated

Table 1: PWD’s Roads and Drains’ Division Activities on September 30, 2026

The Roads and Drains Division of the Public Works Department is dedicated to maintaining and repairing public roads and drainage systems across Saint Kitts.

Help us identify roads and drains in need of repair by visiting our Street Scout page today!

See What’s Happening Now for an active list of field activity from the Public Works and Water Services Departments.

For more from the Public Works Department, visit mopieudt.gov.kn and follow the PWD’s Facebook page and Ministry’s social media pages for updates.

Water security starts with you. Every drop saved helps protect our nation's water supply. Join the campaign and discover simple ways to conserve water, reduce waste, and help build a more resilient St. Kitts—because every action matters, and every drop counts.
Water Conservation Flyer

Current Campaigns

Street Scout

Related articles

New “What’s Happening Now” Page to Improve Operational Transparency

Basseterre, Saint Kitts (Public Infrastructure News) - On Monday, September 28, 2026, the Ministry of Public Infrastructure, Energy...

PWD Resumes Operations at Half Way Tree; Continues Works at Douglas Estate

Basseterre, Saint Kitts (Public Infrastructure News) – On Monday, September 28, 2026, the Roads and Drains Division of the Public Works...

Latest Update on Road and Drainage Works in Saint Kitts

Basseterre, Saint Kitts (Public Infrastructure News) – On Friday, September 25, 2026, officers of the Roads and Drains Division...

Road and Drainage Works Advance in Saint Peter and Saint Thomas

Basseterre, Saint Kitts (Public Infrastructure News) – On Thursday, September 24, 2026, personnel in the Roads and Drains Division...