PWD Roads and Drains Division Activity for July 2 – 3, 2025

Date:

Basseterre, St. Kitts (MoPIEUDT NEWS) – The Roads and Drains Division of the Public Works Department (PWD) will continue its work to maintain and upgrade the roadways around the island:

  • Following the milling of Bourkes Road, Sandy Point, on July 1, 2025, the team will prepare the road for paving.
  • Additionally, work continues on the retaining wall in Trinity and the wing wall in Half Moon.
  • The team will also continue to trim overgrown shrubs along the roadway at the Southeast Peninsula.

These activities will continue on Thursday, July 3.

The PWD asks pedestrians and drivers to be alert when travelling through these areas.

For more information, visit mopieudt.gov.kn and follow the PWD on Facebook.

Water security starts with you. Every drop saved helps protect our nation's water supply. Join the campaign and discover simple ways to conserve water, reduce waste, and help build a more resilient St. Kitts—because every action matters, and every drop counts.
Water Conservation Flyer

Current Campaigns

Street Scout

Related articles

Contractors Invited to Bid on the La Guerite Roof Repairs Project

Basseterre, Saint Kitts (Public Infrastructure News) – The Government of Saint Kitts and Nevis invites bids on the La...

PWD Continues Operations at East Park Range and The Bay Road

Basseterre, Saint Kitts (Public Infrastructure News) – On Thursday, October 15, 2026, the Roads and Drains Division of the Public Works...

Bay Road Collapse Prompts Road Closure, Assessments

Basseterre, St. Kitts (Public Infrastructure News) – An unexpected asphalt collapse along the Bay Road near Thibou Avenue in...

Training Session Strengthens Skills of Quarry Personnel

Basseterre, St. Kitts (Public Infrastructure News) - Staff members of the Quarry Division of the Public Works Department...