Urgent Public Notice of Construction Work at the JNF General Hospital

Date:

The Ministry of Health is undertaking a construction related project at the site of the JNF General Hospital. These works include backfilling works currently in progress at the northern section of the JNF Hospital Site.  

The Public Works Department asks residents within the proximity to be aware and take all necessary precautions to protect themselves and their property from the dust. Work is expected to be concluded on or before March 14, 2025

We apologize for any inconvenience caused during this period. 

Thanks for your understanding in this matter. 

Management 

Water security starts with you. Every drop saved helps protect our nation's water supply. Join the campaign and discover simple ways to conserve water, reduce waste, and help build a more resilient St. Kitts—because every action matters, and every drop counts.
Water Conservation Flyer

Current Campaigns

Street Scout

Related articles

PWD Continues Road and Drainage Works in Saint Thomas and Saint Peter

Basseterre, Saint Kitts (Public Infrastructure News) – On Tuesday, September 22, 2026, the Roads and Drains Division of the Public Works...

Take a Look at PWD’s Fieldwork for September 21, 2026

Basseterre, Saint Kitts (Public Infrastructure News) – On Monday, September 21, 2026, the Roads and Drains Division of the Public Works...

PWD Field Teams Carry Out Road and Drainage Improvements in St. Peters and Half Way Tree

Basseterre, Saint Kitts (Public Infrastructure News) – On Tuesday, September 15, 2026, the Roads and Drains Division (RDD) of...

PWD’s Fieldwork and In-House Operations Continue

Basseterre, Saint Kitts (Public Infrastructure News) – On Monday, September 14, 2026, the Roads and Drains Division (RDD) of...